Overview:
Voltsecure was appointed to support a major air conditioning upgrade at one of Wales' premier coastal hotels. The project required significant enhancements to the electrical infrastructure to accommodate the increased load demands of the new HVAC systems, all while maintaining business continuity in a live hotel environment.
Our Role:
We carried out comprehensive electrical works across the site, including:
- Installation of new power supplies dedicated to the upgraded air conditioning system
- Upgrades to MCCB panel boards to increase overall capacity and ensure safe, reliable distribution
- Coordination with HVAC contractors and hotel management to ensure phased delivery and minimal disruption to guests
The Result:
The hotel now benefits from a modern, efficient air conditioning system underpinned by a robust electrical infrastructure built to handle current and future demand. The upgrade was delivered on time and to the highest standards, contributing to the comfort of guests and the long-term operational efficiency of the hotel.

